Share:


Prioritization of road projects — A disutility based approach

    Bhargab Maitra Affiliation
    ; Moen Azmi Affiliation
    ; S. N. Ibrahim Affiliation

Abstract

In order to boost the economic growth India has initiated a massive road infrastructure development programme. However, due to serious constrains in financial resources, non-availability of adequate technical manpower, institutional constraints etc., it is not possible to execute all the necessary road development projects within a short time span. Besides, it is essential to prioritize roads on a logical rational basis and target the development in a phased manner. In the present paper the a methodology has been proposed for the prioritization of road development. Relevant influencing factors for prioritization have been identified and their relative weights have been estimated based on an expert-opinion survey. The total disutilities on existing roads have been measured and the prioritization has been proposed on the basis of estimated total disutility. The methodology demonstrated in the paper is simple and requires data which are either available from secondary sources or may be obtained easily from simple primary surveys.


First Published Online: 19 Oct 2011

Keyword : road infrastructure

How to Cite
Maitra, B., Azmi, M., & Ibrahim, S. N. (2002). Prioritization of road projects — A disutility based approach. Transport, 17(2), 52-56. https://doi.org/10.3846/16483480.2002.10414011
Published in Issue
Apr 30, 2002
Abstract Views
384
PDF Downloads
320
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.