[1]
Jaśkowski, P. and Biruk, S. 2011. The method for improving stability of construction project schedules through buffer allocation. Technological and Economic Development of Economy. 17, 3 (Oct. 2011), 429-444. DOI:https://doi.org/10.3846/20294913.2011.580587.