1.
Shi G, Tong J, Chen Z, Wang Y. Optimal time-based and cost-based contracts in construction projects under asymmetric information. JCEM [Internet]. 2025Mar.27 [cited 2025Apr.2];31(4):299–317. Available from: https://jau.vgtu.lt/index.php/JCEM/article/view/23318