Shi, G., J. Tong, Z. Chen, and Y. Wang. “Optimal Time-Based and Cost-Based Contracts in Construction Projects under Asymmetric Information”. Journal of Civil Engineering and Management, vol. 31, no. 4, Mar. 2025, pp. 299–317, doi:10.3846/jcem.2025.23318.