Shi, G., Tong, J., Chen, Z. and Wang, Y. (2025) “Optimal time-based and cost-based contracts in construction projects under asymmetric information”, Journal of Civil Engineering and Management, 31(4), pp. 299–317. doi: 10.3846/jcem.2025.23318.