Koo, Choongwan, Taehoon Hong, and Sangbum Kim. 2015. “An Integrated Multi-Objective Optimization Model for Solving the Construction Time-Cost Trade-off Problem”. Journal of Civil Engineering and Management 21 (3):323-33. https://doi.org/10.3846/13923730.2013.802733.