Shi, G., Tong, J., Chen, Z., & Wang, Y. (2025). Optimal time-based and cost-based contracts in construction projects under asymmetric information.
Journal of Civil Engineering and Management
,
31
(4), 299–317. https://doi.org/10.3846/jcem.2025.23318