Decision-making of corporate clients during strategic briefing process according to knowledge acquisition types
Abstract
Organizational clients with limited experience in strategic briefing often face challenges in identifying building project outcomes for achieving a competitive edge in their business. Communication with practitioners during strategic briefing facilitates clients in acknowledging the importance of timely decision-making and being involved in a knowledge spiral to acquire the information. Knowledge-acquisition by clients can lead to behavioral changes, both within themselves and their organizations. This study classifies knowledge-acquisition types (KATs) and investigates the potential for rational decision-making in briefings. A framework, developed through a literature review and practical insights, is validated by introducing the Action Research approach with stakeholders across ten building projects in sectors: manufacturing, retail, and public enterprises. The framework, refined during interactions among researchers, clients and service providers, identifies KAT1 as the domain knowledge, KAT2 as the administrative knowledge, and KAT3 is the facility knowledge of clients. KAT4, the difference between groups with and without construction-project experiences, relates to the procedures for achieving strategic objectives. This involves understanding the project and organizational characteristics through knowledge accumulation and managing client interactions to ensure successful projects. The Action Research framework facilitates knowledge exchange among clients and practitioners, empowering corporate clients to effectively achieve strategic objectives through group decision-making.
Keyword : Action Research, strategic briefing, decision-making, group decision-making, knowledge management, knowledge acquisition

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Ahmad, N., Ismail, F., Alwi, S. N. A. S., & Rashid, R. A. (2011). Important client attributes that influence object success: a focus on the briefing process. In IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA) (pp. 314–319), Langkawi, Malaysia. https://doi.org/10.1109/ISBEIA.2011.6088828
Allee, V. (1997). The knowledge evolution: Expanding organizational intelligence. Butterworth–Heinemann.
Amer, M., & Attia, S. (2019). Identification of sustainable criteria for decision-making on roof stacking construction method. Sustainable Cities and Society, 47, Article 101456. https://doi.org/10.1016/j.scs.2019.101456
American Psychological Association. (2002). Ethical principles of psychologists and code of conduct.
Anumba, C. J., & Pulsifer, D. (2010). Knowledge management systems for construction. In Proceedings of Construction Research Congress 2010 (pp. 687–696). https://doi.org/10.1061/41109(373)69
Arif, F., Bayraktar, M. E., & Chowdhury, A. G. (2016). Decision support framework for infrastructure maintenance investment decision making. Journal of Management in Engineering, 32(1), Article 04015030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000372
Aronson, J. E. (2003). Expert systems. In Encyclopedia of information systems (pp. 277–289). Elsevier. https://doi.org/10.1016/B0-12-227240-4/00067-8
Atkinson, P., Coffey, A., Delamont, S., Lofland, J., & Lofland, L. (2001). Handbook of ethnography. Sage. https://doi.org/10.4135/9781848608337
Awad, E. M., & Ghaziri, H. M. (2004). Knowledge management. Pearson Education, Inc.
Azhar, S., Ahmad, I., & Sein, M. K. (2010). Action research as a proactive research method for construction engineering and management. Journal of Construction Engineering and Management, 136(1), 87–98. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000081
Bardi, M. (2021). How can I make something interesting for me relevant for the wider community? An ethnographic exploration of Romanian researchers’ adjustment to research communication standards. Journal of English for Academic Purposes, 49, Article 100943. https://doi.org/10.1016/j.jeap.2020.100943
Beach, L. R. (1993). Making the right decision: Organizational culture, vision, and planning. Prentice-Hall, Inc.
Berri, J. (2010). Towards a framework for collective intelligence. In 2010 Fifth International Conference on Digital Information Management (ICDIM) (pp. 454–459), Thunder Bay, ON, Canada. https://doi.org/10.1109/ICDIM.2010.5662446
Blommaert, J. (2018). Durkheim and the Internet: On sociolinguistics and the sociological imagination. Bloomsbury Publishing. https://doi.org/10.5040/9781350055223
Bryman, A. (2016). Social research methods. Oxford University Press.
Bukowitz, W., & Williams, R. (2000). The knowledge management fieldbook. Prentice Hall, Inc.
Carrillo, P., & Chinowsky, P. (2006). Exploiting knowledge management: The engineering and construction perspective. Journal of Management in Engineering, 22(1), 2–20. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:1(2)
Cheng, W., Holyoak, K. J., Nusbett, R. E., & Oliver, L. M. (1986). Pragmatic versus syntactic approaches to training deductive reasoning. Cognitive Psychology, 18(3), 293–328. https://doi.org/10.1016/0010-0285(86)90002-2
Chung, J. K. H., Kumaraswamy, M. M., & Palaneeswaran, E. (2009). Improving megaproject briefing through enhanced collaboration with ICT. Automation in Construction, 18(7), 966–974. https://doi.org/10.1016/j.autcon.2009.05.001
Dalkir, K. (2011). Knowledge management in theory and practice. Massachusetts Institute of Technology.
Dave, B., & Koskela, L. (2009). Collaborative knowledge management: A construction case study. Automation in Construction, 18(7), 894–902. https://doi.org/10.1016/j.autcon.2009.03.015
Dikmen, M., & Burns, C. (2022). The effects of domain knowledge on trust in explainable AI and task performance: A case of peer-to-peer lending. International Journal of Human-Computer Studies, 162, Article 102792. https://doi.org/10.1016/j.ijhcs.2022.102792
Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., Hashemi, H., & Vahdani, B. (2012). A novel two-phase group decision making approach for construction project selection in a fuzzy environment. Applied Mathematical Modelling, 36(9), 4197–4217. https://doi.org/10.1016/j.apm.2011.11.050
Eden, C., & Ackermann, F. (2018). Theory into practice, practice to theory: Action research in method development. European Journal of Operational Research, 271(3), 1145–1155. https://doi.org/10.1016/j.ejor.2018.05.061
Eleftheriadis, S., Duffour, P., & Mumovic, D. (2018). Participatory decision-support model in the context of building structural design embedding BIM with QFD. Advanced Engineering Informatics, 38, 695–711. https://doi.org/10.1016/j.aei.2018.10.001
Fan, S., & Shen, Q. (2011). The effect of using group decision support systems in value management studies: An experimental study in Hong Kong. International Journal of Project Management, 29(1), 13–25. https://doi.org/10.1016/j.ijproman.2010.01.008
Gaziano, C. (2017). Knowledge gap: History and development. In The international encyclopedia of media effects. https://doi.org/10.1002/9781118783764.wbieme0041
Gaziano, E., & Gaziano, C. (1999). Social control, social change and the knowledge gap hypothesis. In D. Demers, & K. Viswanath (Eds.), Mass media, social control, and social change: A macro-social perspective (pp. 117–136). Iowa State University Press.
Green, S. D. (1996). A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(2), 155–164. https://doi.org/10.1080/014461996373593
Greenberg, J., Schmader, T., Arndt J., & Landau M., (2017). Social psychology: The science of everyday life. Worth Publishers.
Gold, B., & Vassell, C. (2015). Using risk management to balance agile methods: A study of the Scrum process. In International Conference on Knowledge-Based Engineering and Innovation (KBEI) (pp. 49–54). IEEE. https://doi.org/10.1109/KBEI.2015.7436020
Halpin, T., & Morgan, T. (2008). Conceptual modeling: First steps. In Information modeling and relational databases (2nd ed., pp. 59–108). Morgan Kaufmann. https://doi.org/10.1016/B978-012373568-3.50007-2
Hayes, S. C., & Smith, S. (2005). Get out of your mind and into your life: The new acceptance and commitment therapy. New Harbinger Publications.
Hwang, B. G., Shan, M., & Looi, K. Y. (2018). Knowledge–based decision support system for prefabricated prefinished volumetric construction. Automation in Construction, 94, 168–178. https://doi.org/10.1016/j.autcon.2018.06.016
International Organization for Standardization. (2000). Quality management systems – Fundamentals and vocabulary (ISO Standard No. 9000:2000).
Irma, B. F., Avellino, G., & Rajiv, S. (2004). Knowledge management, challenges, solutions, and technologies. Pearson Education, Inc.
Johnson, D. W., & Johnson, F. P. (2012). Joining together: Group theory and group skills (11th ed.). Pearson.
Kamara, J. M., Anumba, C. J., & Evbuomwan, N. F. O. (1999). Client requirements processing in construction – A new approach using QFD. Journal of Architectural Engineering, 5(1), 8–15. https://doi.org/10.1061/(ASCE)1076–0431(1999)5:1(8)
Kamel, M. N. (2007). Knowledge acquisition. In Willey encyclopedia of electrical and electronics engineering. https://doi.org/10.1002/9780470050118.ecse205
Kellogg, R. T. (2016). Fundamentals of cognitive psychology (3rd ed). SAGE Publications. Inc. https://doi.org/10.4135/9781483399331
Kiani Mavi, R. K., & Standing, C. (2018). Critical success factors of sustainable project management in construction: A fuzzy DEMATEL–ANP approach. Journal of Cleaner Production, 194, 751–765. https://doi.org/10.1016/j.jclepro.2018.05.120
Kim, J. H. (2003). An approach to facilitate knowledge streams of occasional individual building industry clients at the preproject stage. School of Construction Management and Engineering, The University of Reading.
Kivrak, S., Arslan, G., Dikmen, I., & Birgonul, M. T. (2008). Capturing knowledge in construction projects: Knowledge platform for contractors. Journal of Management in Engineering, 24(2), 87–95. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:2(87)
Kometa, S. T., Olomolaiye, P. O., & Harris, F. C. (1996). A review of client-generated risks to project consultants. International Journal of Project Management, 14(5), 273–279. https://doi.org/10.1016/0263-7863(96)84510-8
Korotkova, N., Lillieskold, J., & Hetemi, E., (2024). Pursuing openness in the digital age: Insights from client-contractor knowledge collaboration at the project front end. International Journal of Project Management, 42(1), Article 102564. https://doi.org/10.1016/j.ijproman.2024.102564
Krabbenborg, L., Molin, E., Annema, J. A., & Van Wee, B. V. (2020). Public frames in the road pricing debate: A Q–methodology study. Transport Policy, 93, 46–53. https://doi.org/10.1016/j.tranpol.2020.04.012
Liebowitz, J., (1999). Knowledge management handbook (1st ed.). CRC Press.
Lilien, G. L. (2016). The B2B knowledge gap. International Journal of Research in Marketing, 33, 543–556. https://doi.org/10.1016/j.ijresmar.2016.01.003
Love, P. E. D., Edwards, D. J., Irani, Z., & Sharif, A. (2012). Participatory action research approach to public sector procurement selection. Journal of Construction Engineering and Management, 138(3), 311–322. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000440
Luo, X., Shen, G. Q., & Fan, S. (2010). A case-based reasoning system for using functional performance specification in the briefing of building projects. Automation in Construction, 19(6), 725–733. https://doi.org/10.1016/j.autcon.2010.02.017
Luo, X., Shen, G. Q., Fan, S., & Xue, X. (2011). A group decision support system for implementing value management methodology in construction briefing. International Journal of Project Management, 29(8), 1003–1017. https://doi.org/10.1016/j.ijproman.2010.11.003
McKay, J., & Marshall, P. (2001). The dual imperatives of action research. Information Technology and People, 14(1), 46–59. https://doi.org/10.1108/09593840110384771
Martin, D. W. (2007). Doing psychology experiments (7th ed.). Thomson/Wadsworth.
Martino, B. D., Kumaran, D., Seymour, B., & Dolan, R. J. (2006). Frames, biases, and rational decision-making in the human brain. Science, 313, 684–687. https://doi.org/10.1126/science.1128356
McIntosh, P. (2010). Action research and reflective practice. Creative and visual methods to facilitate reflection and learning (1st ed.). Routledge. https://doi.org/10.4324/9780203860113
McKernan, J. (1996). Curriculum action research. A handbook of methods and resources for the reflective practitioner. Routledge. https://doi.org/10.4324/9781315041742
Mertler, C. A., & Charles, C. M. (2011). Introduction to educational research (7th ed.). Pearson.
Mertler, C. A. (2016). Introduction to educational research. Sage.
Morton-Cooper, A., & Palmer, A. (2000). Mentoring, preceptorship and clinical supervision: A guide to professional roles in clinical practice (2nd ed). Wiley-Blackwell.
Naughton, G. M., & Hughes, P. (2008). Doing action research in early childhood studies: a step by step guide. Open University Press.
Nonaka, I., & Takeuchi, H. (1995). The knowledge-creating company: How Japanese companies create the dynamics of innovation (1st ed.). Oxford University Press. https://doi.org/10.1093/oso/9780195092691.001.0001
Rupietta, C., & Backes-Gellner, U. (2019). Combining knowledge stock and knowledge flow to generate superior incremental innovation performance – Evidence from Swiss manufacturing. Journal of Business Research, 94, 209–222. https://doi.org/10.1016/j.jbusres.2017.04.003
Nutt, B. (1993). The strategic brief. Facilities, 11(9), 28–32. https://doi.org/10.1108/EUM0000000002257
Nzembayie, K. F., Buckley, A. P., & Cooney, T. (2019). Researching pure digital entrepreneurship – A multimethod insider action research approach. Journal of Business Venturing Insights, 11, Article e00103. https://doi.org/10.1016/j.jbvi.2018.e00103
Onubi, H. O., Yusof, N. A., & Hassan, A. S. (2020). How environmental performance influence client satisfaction on projects that adopt green construction practices: The role of economic performance and client types. Journal of Cleaner Production, 272, Article 122763. https://doi.org/10.1016/j.jclepro.2020.122763
Papulova, Z., & Gazova, A. (2016). Role of strategic analysis in strategic decision-making. Procedia Economics and Finance, 39, 571–579. https://doi.org/10.1016/S2212-5671(16)30301-X
Reed, S. K. (2012). Cognition: Theories and applications (9th ed.). Cengage Learning.
Ren, P., Xu, Z., Wang, X., & Zeng, X. J. (2021). Group decision making with hesitant fuzzy linguistic preference relations based on modified extent measurement. Expert Systems with Applications, 171, Article 114235. https://doi.org/10.1016/j.eswa.2020.114235
Robbins, S. P., Coulter, M. K., & DeCenzo, D. A. (2017). Fundamentals of management: Essential concepts and applications (10th ed.). Pearson Education.
Sales, B. D., & Folkman, S. (2000). Ethics in research with human participants. American Psychological Association.
Shen, Q., Li, H., Chung, J., & Hui, P. Y. (2004). A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(2), 213–221. https://doi.org/10.1080/0144619042000201411
Sievinen, H. M., Ikäheimonen, T., & Pihkala, T. (2020). Owners’ rule-based decision-making in family firm strategic renewal. Scandinavian Journal of Management, 36(3), Article 101119. https://doi.org/10.1016/j.scaman.2020.101119
Tam, C., Moura, E. J. d. C., Oliveira, T., & Varajão, J. (2020). The factors influencing the success of on–going agile software development projects. International Journal of Project Management, 38, 165–176. https://doi.org/10.1016/j.ijproman.2020.02.001
Tan, H. C., Carrillo, P. M., & Anumba, C. J. (2012). Case study of knowledge management implementation in a medium-sized construction sector firm. Journal of Management in Engineering, 28(3), 338–347. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000109
Tang, L. Y., Shen, G. Q., Skitmore, M., & Wang, H. (2015). Procurement-related critical factors for briefing in public-private partnership projects: Case of Hong Kong. Journal of Management in Engineering, 31(6), Article 4014096. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000352
Thelwall, M., & Nevill, T. (2021). Is research with qualitative data more prevalent and impactful now? Interviews, case studies, focus groups and ethnographies. Library & Information Science and Research, 43, Article 101094. https://doi.org/10.1016/j.lisr.2021.101094
Tichenor, P. A., Donohue, G. A., & Olien, C. N. (1970). Mass media flow and differential growth in knowledge. Public Opinion Quarterly, 34(2), 159–170. https://doi.org/10.1086/267786
Wazlawick, R. S. (2013). Object-oriented analysis and design for information systems, modeling with UML, OCL, and IFML. Elsevier. https://doi.org/10.1016/B978-0-12-418673-6.00002-8
Wong, C. (2019). Motivation in knowledge workers [PhD thesis]. University of Notre Dame Australia, Australia.
Wuni, I. Y., & Shen, G. Q. (2020). Fuzzy modelling of the critical failure factors for modular integrated construction projects. Journal of Cleaner Production, 264, Article 121595. https://doi.org/10.1016/j.jclepro.2020.121595
Xiao, W. (2012). Essays on knowledge management. Georgia Institute of Technology.
Xu, N., Ma, L., Wang, L., Deng, Y., & Ni, G. (2021). Extracting domain knowledge elements of construction safety management: Rule-based approach using Chinese natural language processing. Journal of Management in Engineering, 37(2), Article 04021001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000870
Yu, A. T. W., & Shen, G. Q. P. (2015). Critical success factors of the briefing process for construction projects. Journal of Management in Engineering, 31(3), Article 04014045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000242
Yu, A. T. W, Shen, Q., Kelly, J., & Hunter, K. (2008). Comparative study of the variables in construction project briefing/Architectural programming. Journal of Construction Engineering and Management, 134(2), 122–138. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(122)
Zhong, S., Elhegazy, H., & Elzarka, H. (2022). Key factors affecting the decision-making process for buildings projects in Egypt. Ain Shams Engineering Journal, 13, Article 101597. https://doi.org/10.1016/j.asej.2021.09.024
Zwemmer, M. (2008). Engaging users in briefing and design a strategic framework: A strategic framework. Eindhoven University of Technology.