Share:


A dynamic simulation model for financing strategy management of infrastructure PPP projects

    Yuqing Zhang   Affiliation
    ; Wenhua Hou   Affiliation
    ; Yan Qian Affiliation

Abstract

Strategic management is vital for significant infrastructure public-private partnership (PPP) projects characterised by a heavy and irreversible investment over a long period. In PPP projects, the financing strategy relates to the capital structure of the project and the coordination of the participants’ requirements. In this paper, a system dynamics (SD) model is described to analyse the impacts of two types of financing strategies on the needs of creditors, the government, and private investors, considering the dynamic and complex characteristics of infrastructure PPP projects. The proposed model has been implemented on a PPP highway project. A number of experiments were conducted over a 33-year strategic planning horizon as a means of assessing the long-term effects of different financing strategies. The experimental results reveal that the model is a useful tool that could support decision-makers in identifying the intervals with different management focus of financing risk and comparing different financing strategies to choose the optimal one. It is especially helpful for the government to select a financing strategy for infrastructure PPP projects with capital limitations.

Keyword : infrastructure projects, financing strategy management, decision-making, simulation model, public-private partnership, capital structure

How to Cite
Zhang, Y., Hou, W., & Qian, Y. (2020). A dynamic simulation model for financing strategy management of infrastructure PPP projects. International Journal of Strategic Property Management, 24(6), 441-455. https://doi.org/10.3846/ijspm.2020.13627
Published in Issue
Dec 3, 2020
Abstract Views
1189
PDF Downloads
936
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

References

Bakatjan, B., Arikan, M., & Tiong, R. L. K. (2003). Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), 89–97. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(89)

Burger, P., & Tyson, J. (2006). The effects of the financial crisis on public-private partnerships. International Monetary Fund, Washington.

Chen, B., Mao, C.-K., & Hu, J.-L. (2015). The optimal debt ratio of public-private partnership projects. International Journal of Construction Management, 15(3), 239–253.
https://doi.org/10.1080/15623599.2015.1062217

Coyle, R. G. (1983). The technical elements of the system dynamics approach. European Journal of Operational Research, 14, 359–370. https://doi.org/10.1016/0377-2217(83)90236-9

Feng, K., Xiong, W., Wang, S., Wu, C., & Xue, Y. (2017). Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9), 04017067.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001349

Feng, K., Wang, S., Li, N., Wu, C., & Xiong, W. (2018). Balancing public and private interest through optimization of concession agreement design for user-pay PPP projects. Journal of Civil Engineering and Management, 24(2), 116–129. https://doi.org/10.3846/jcem.2018.455

HM Treasury. (2015). Efficient drive by government on PPPs nets 2.1 billion pounds. https://www.gov.uk/government/news/efficiency-drive-by-government-on-ppps-nets-21-billion

Hong, Y., Shen, L., Tan, Y., & Hao, J. (2011). Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects. Automation in Construction, 20(8), 1060–1069. https://doi.org/10.1016/j.autcon.2011.04.007

Iyer, K. C., & Sagheer, M. (2012). Optimization of bid-winning potential and capital structure for Build-Operate-Transfer road projects in India. Journal of Management in Engineering, 28(2), 104–113. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000071

Ministry of Transport of the People’s Republic of China. (2008). Highway Technical Condition Assessment Standard (JTG H202007) (1st ed.). China Communications Press (in Chinese).

Papadopoulos, T. (2012). Public-private partnerships from the systems perspective: a case in the English National Health Service. Systems Research and Behavioral Science, 29(4), 420–435. https://doi.org/10.1002/sres.2110

Rashedi, R., & Hegazy, T. (2016). Strategic policy analysis for infrastructure rehabilitation using system dynamics. Structure and Infrastructure Engineering, 12(6), 667–681.
https://doi.org/10.1080/15732479.2015.1038723

Rehan, R., Knight, M. A., Unger, A. J. A., & Haas, C. T. (2013). Development of a system dynamics model for financially sustainable management of municipal water main networks. Water Research, 47(20), 7148–7205.
https://doi.org/10.1016/j.watres.2013.09.061

Ren, F. (2016). SD-based study about stakeholder impact on highway pavement maintenance system [Unpublished master dissertation]. Zhejiang University, Hangzhou, China (in Chinese).

Sharma, D. K., Cui, Q. B., Chen, L., & Lindly, J. K. (2010). Balancing private and public interests in public private partnership contracts through optimization of equity capital structure. Journal of the Transportation Research Board, 2151, 60–66. https://doi.org/10.3141/2151-08

Soomro, M. A., & Zhang, X. (2015). Roles of private-sector partners in transportation public-private partnership failures. Journal of Management in Engineering, 31(4), 04014056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000263

Sterman, J. (2000). Business dynamics: systems thinking and modeling for a complex world. Irwin/McGraw-Hill.

Subprasom, K. (2004). Multi-party and multi-objective network design analysis for the build-operate-transfer scheme [Dissertation]. Utah State University, The United States.

Xue, Y., Guan, H., Corey, J., Wei, H., & Yan, H. (2017). Quantifying a financially sustainable strategy of public transport: private capital investment considering passenger value. Sustainability, 9(2), 269–289. https://doi.org/10.3390/su9020269

Yang, H., & Meng, Q. (2000). Highway pricing and capacity choice in a road network under a build-operate-transfer scheme. Transportation Research, Part A (Policy and Practice), 34(3), 207–222. https://doi.org/10.1016/S0191-2615(01)00018-2

Yescombe, E. R. (2014). Principles of project finance. Academic Press. https://doi.org/10.1016/B978-0-12-391058-5.00004-7

Zhang, X. (2005). Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), 656–668.
https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(656)

Zhang, X. Q. (2009). Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), 550–558. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000012